KWS will carry out the project. The municipality of Bergen op Zoom has made it a condition that KWS also takes care of communication with all stakeholders. A sounding board group has been set up for this purpose. The following are represented in this sounding board group: the municipality, KWS, residents, entrepreneurs, the Halsteren Village Council, the Fietsersbond, Accessible Bergen op Zoom
In the preliminary phase of the redesign, a working group was active in which the residents, the Halsteren Village Council and the Fietsersbond (Accessible Bergen op Zoom) were represented.
During the process, attention was paid to aspects of accessibility. The chairman of the Fietsersbond has drawn attention to these aspects because of his expertise.
This concerned in particular the width of the sidewalks and the safe crossing of the Randweg Noord, from the Halsterseweg from Intratuin to the bus stop and crossing side streets, especially to and from the Oudeweg.
During the work, especially in consultation with the residents, accessibility will have to be a point of discussion for the residents themselves and for their visitors. In addition, appropriate measures will have to be taken with regard to the temporary routes and diversion routes in the case of busy destinations. Road builders themselves have a lot of knowledge and experience with this aspect.